UNFPA/MD/RFQ/37/2023 - Supply and installation of AC units and inox tables
The goods are to be delivered maximum in 60 calendar days upon issuing of PO. The quotation shall bevalid at least for 90 days after the RFQ closing date.
Note: Partial Quotes will be accepted. The transportation cost should be included in the total price of the quotation.
If you are interested in submitting a quotation for these items, kindly fill in the attached Quotation Form and send by email to the address indicated below:
Email: tender.mda@unfpa.org
Please submit your quotation in MDL or USD currency. Conversion of currency into the UNFPA preferred currency, if the offer is quoted differently from what is required, shall be based only on UN Operational Exchange Rate (https://treasury.un.org/operationalrates/OperationalRates.php) prevailing at the time of competition deadline.
Your earliest response to this query would be highly appreciated, but not later than 22/12/2023, 16:30 (GMT +3, Moldova Local Time).